Client:
Whitehall Mansions office block, which also houses the British High Commission.
Solution:
AIS provided a Building Management System which incorporated a centralized control of the lighting circuits, air conditioning system and door monitoring. An automatic billing system for the electricity, water and thermal consumption is also an integrated feature of this building system.