The project consists of a SCADA control system between turnout chamber and a pressure reducing valve at the end of the main line.
The system is designed so that the SCADA programs and protocols used, will be fully compatible with a Computer aided Irrigation system.
Communication between these 2 points is over 35km of fiber-optic cable.